Roq ApiAPI for algorithmic and high-frequency trading
Stars: ✭ 132 (-25.42%)
Socktrader🚀 Websocket based trading bot for 💰cryptocurrencies 📈
Stars: ✭ 152 (-14.12%)
AatAsynchronous, event-driven algorithmic trading in Python and C++
Stars: ✭ 109 (-38.42%)
pancakeswap-prediction-winner🔥 PancakeSwap is afraid of this CHROME EXTENSION (and CLI)! This bot wins almost every 5 minute BNB-USD option on PancakeSwap (and Candle Genie).
Stars: ✭ 229 (+29.38%)
Benzaiboten-spot-trading-botA trading bot easy to use to be linked to your favorite exchange to automatize the trading on cryptocurrencies
Stars: ✭ 20 (-88.7%)
Bybit-Auto-Trading-Bot-Ordes-placed-via-TradingView-WebhookPython based Trading Bot that uses TradingView.com webhook JSON alerts to place orders(buy/sell/close/manage positions/TP/SL/TS etc.) on Bybit.com. Hire me directly here https://www.freelancer.com/u/Beannsofts for any assistance
Stars: ✭ 235 (+32.77%)
ciraCira algorithmic trading made easy. A Façade library for simpler interaction with alpaca-trade-API from Alpaca Markets.
Stars: ✭ 21 (-88.14%)
Trading BotCode for automated FX trading
Stars: ✭ 68 (-61.58%)
Gtradera trading strategy trainer, back-tester and bot
Stars: ✭ 71 (-59.89%)
Chanlun文件 笔和线段的一种划分.py,只需要把k线high,low数据输入,就能自动实现笔,线段,中枢,买卖点,走势类型的划分了。可以把sh.csv 作为输入文件。个人简历见.pdf。时间的力量。有人说择时很困难,有人说选股很容易,有人说统计套利需要的IT配套设施很重要。还有人说系统有不可测原理。众说纷纭。分布式的系统,当你的影响可以被忽略,你才能实现,Jiang主席所谓之,闷声发大财。
Stars: ✭ 206 (+16.38%)
TribecaA high frequency, market making cryptocurrency trading platform in node.js
Stars: ✭ 3,646 (+1959.89%)
BitvisionTerminal dashboard for trading Bitcoin, predicting price movements, and losing all your money
Stars: ✭ 957 (+440.68%)
CatedCATEd - Cryptocurrency Analytics and Trading Engine for Django
Stars: ✭ 84 (-52.54%)
PymarketcapPython3 API wrapper and web scraper for https://coinmarketcap.com
Stars: ✭ 73 (-58.76%)
PytrendfollowPyTrendFollow - systematic futures trading using trend following
Stars: ✭ 127 (-28.25%)
Ob AnalyticsR package intended for visualisation, analysis and reconstruction of limit order book data
Stars: ✭ 110 (-37.85%)
Dnspythona powerful DNS toolkit for python
Stars: ✭ 1,838 (+938.42%)
ZanphpPHP开发面向C10K+的高并发SOA服务 和RPC服务首选框架
Stars: ✭ 1,451 (+719.77%)
Switchioasyncio powered FreeSWITCH cluster control
Stars: ✭ 160 (-9.6%)
Quant TradingPython quantitative trading strategies including VIX Calculator, Pattern Recognition, Commodity Trading Advisor, Monte Carlo, Options Straddle, Shooting Star, London Breakout, Heikin-Ashi, Pair Trading, RSI, Bollinger Bands, Parabolic SAR, Dual Thrust, Awesome, MACD
Stars: ✭ 2,407 (+1259.89%)
AiometerA Python concurrency scheduling library, compatible with asyncio and trio.
Stars: ✭ 110 (-37.85%)
MopStock market tracker for hackers.
Stars: ✭ 1,534 (+766.67%)
Tradingview Webhook Bot⚙️ Send TradingView alerts to Telegram, Discord, Slack, Twitter and/or Email.
Stars: ✭ 135 (-23.73%)
Zvtmodular quant framework.
Stars: ✭ 1,801 (+917.51%)
BackoffPython library providing function decorators for configurable backoff and retry
Stars: ✭ 1,670 (+843.5%)
Interactive Broker Python ApiA python client library for the different APIs offered by Interactive Broker including the Trader Workstation API, Client Portal Web API, and Client Portal Streaming Web API.
Stars: ✭ 165 (-6.78%)
Openalgo💹 openAlgo is a public repository for various work product relavant to algorithms and the high frequency low latency electronic trading space with a bias toward market microstructure as well as exchange traded futures and options.
Stars: ✭ 158 (-10.73%)
Aioredis Pyasyncio (PEP 3156) Redis support
Stars: ✭ 2,003 (+1031.64%)
CryptotraderThis is an experimental trading bot framework written in PHP. It may contain bugs and should not be trusted with much money
Stars: ✭ 108 (-38.98%)
Core🏡 Open source home automation that puts local control and privacy first.
Stars: ✭ 48,265 (+27168.36%)
CppcoroA library of C++ coroutine abstractions for the coroutines TS
Stars: ✭ 2,118 (+1096.61%)
GekkoA bitcoin trading bot written in node - https://gekko.wizb.it/
Stars: ✭ 9,839 (+5458.76%)
Bot18Bot18 is a high-frequency cryptocurrency trading bot developed by Zenbot creator @carlos8f
Stars: ✭ 157 (-11.3%)
Tradingview TrainerA lightweight app for practicing your trading on Tradingview
Stars: ✭ 106 (-40.11%)
Strategems.jlQuantitative systematic trading strategy development and backtesting in Julia
Stars: ✭ 106 (-40.11%)
RiprovaVersatile async-friendly library to retry failed operations with configurable backoff strategies
Stars: ✭ 106 (-40.11%)
Aioredlock🔒 The asyncio implemetation of Redis distributed locks
Stars: ✭ 171 (-3.39%)
SockjsSockJS Server
Stars: ✭ 105 (-40.68%)
PulsarEvent driven concurrent framework for Python
Stars: ✭ 1,867 (+954.8%)
Pymxgetmxget的Python实现
Stars: ✭ 136 (-23.16%)
AiohttpAsynchronous HTTP client/server framework for asyncio and Python
Stars: ✭ 11,972 (+6663.84%)
CallrouletteA WebRTC demo using Python (asyncio + aiohttp) as the backend
Stars: ✭ 104 (-41.24%)
PythonicGraphical Python programming for trading and automation
Stars: ✭ 131 (-25.99%)
LoaferAsynchronous message dispatcher - Currently using asyncio and amazon SQS
Stars: ✭ 104 (-41.24%)
Aioitertoolsitertools and builtins for AsyncIO and mixed iterables
Stars: ✭ 104 (-41.24%)
Exchanges PhpThis is a virtual currency SDK that brings together multiple exchanges
Stars: ✭ 134 (-24.29%)
Kupi TerminalCcxt based, open source, customized, extendable trading platform that supports 130+ crypto exchanges.
Stars: ✭ 104 (-41.24%)
Binance RsRust Library for the Binance API
Stars: ✭ 164 (-7.34%)
SquantSQuant是使用scala语言编写的量化开发工具箱,提供开箱即用的A股股票数据和外汇数据(docker镜像),以及高效的回测框架与交易模块。方便Java/Scala爱好者进行量化投资研究。 QQ群:281599099,微信公众号:Python量化交易实战。对,我已经转python了。。。
Stars: ✭ 155 (-12.43%)
Robinhood On RailsA web dashboard for the free trading platform Robinhood using Ruby on Rails and a private API
Stars: ✭ 134 (-24.29%)
TradingbotAutonomous stocks trading script
Stars: ✭ 99 (-44.07%)
Binance grid traderA grid trading strategy and trading-bot for Binance Exchange. 币安交易所的网格交易
Stars: ✭ 132 (-25.42%)
GreenletioAsyncio integration with sync code using greenlets.
Stars: ✭ 102 (-42.37%)
Wallstreetbets Sentiment AnalysisThis program finds the most mentioned ticker on r/wallstreetbets and uses Vader SentimentIntensityAnalyzer to calculate the sentiment analysis.
Stars: ✭ 103 (-41.81%)
Python ConcurrencyCode examples from my toptal engineering blog article
Stars: ✭ 131 (-25.99%)